Stucco Weep Screed Codes Explained In Detail!

The building codes do specifically talk about weep screed for stucco and stone applications, and there are a few requirements that you need to be aware of.

These codes might be hard to understand for people who don't work with the material on a daily basis, mainly because they lack a visual aid to them. That's what this article is all about!

What Does The Code Say About Weep Screed?

The code for weep screeds talks about the minimum requirements, for the most part, of not only the weep itself but clearances too. The other part of the code talks about how it should be installed, along with other parts of the stucco system, like the water resistive barrier and wire.

Who Does This Code Apply To?

These codes are International Building Codes, but apply to local state and county codes as well. The idea of an IBC is to have standards that everyone follows, so everyone is on the same page and that will trickle down to more localized state and county codes, as well.

Here is what the code states exactly:

Weep Screeed Code

If we break that down, we can get a more clear visual on what they are talking about...

1. The first part talks about the minimum thickness of the weep screed and the minimum flange length, which is 3-1/2". The flange is the back piece of metal of the weep. It also states that a galvanized metal or plastic material must be used, but there are other corrosion resistant options made by different manufacturers that are offered as well, like aluminum and stainless steel.

Minimum Weeps Screed Flange Length

2. The next part of the code states where the weep should be installed. This is specified at or below the plate line, which is the bottom plate. Most of the time, the weep screed will hang down about an inch lower than the bottom of the bottom plate to allow water to weep out onto the foundation.

Weep Set At Plate Line
Weep Set Below Plate Line

After that, the minimum clearance requirements from the bottom of the weep itself are listed for soil and harder surfaces like concrete and asphalt. If you have soil or dirt then you want to be sure you have at least a 4" gap between the ground and the bottom of the weep screed.

If you have pavers, concrete, asphalt or other hard materials than a 2" minimum gap is required. I have a more extensive post on weep screed clearances that goes into a little more detail on the subject.

Minimum Weep Screed To Soil Clearance

Then the code talks about weep holes and how they should be present and functional. This is not really an issue most of the time as long as you are installing weep screed and not plaster stop. Plaster stop is "J" shaped and does not have any holes in it and is usually used for other areas like exterior doors, electrical panels, etc.

Weep Holes Must Be Present

The last part talks about how the paper should overlap the back flange of the weep screed and the wire (that is applied after the paper) should end somewhere on that flange as well.

The paper usually covers the entire flange and ends where the weep holes start. The wire is usually also terminated here, but the code states that it can be terminated anywhere on the flange itself.

Paper Applied Over Weep
Wire Terminates On Weep Flange
About Me Image
About the Author

The Stucco Guy

Ryan Retired Stucco Contractor

I’m Ryan, a longtime stucco contractor who has spent plenty of years getting dusty, chasing cracks, matching finishes, and figuring out what actually works in the real world. I created TheStuccoGuy.com to make stucco a little less confusing, help homeowners avoid expensive mistakes, and give you practical answers without all the fluff.

Take a look around, and if something still has you scratching your head, send me a question. I’m always happy to help.

Leave a Comment:

2 comments
[email protected] says

I appreciate the clear information you presented. I just have one question for clarification: When you terminate the stucco at the flange of the weep screed on the top, how does it not plug the weep holes? Do you have to do anything special to ensure this does not happen? Thank you!

Reply
    The Stucco Guy says

    Cheers, Thanks for your question, Travis! When stucco is applied, it actually keys into the weep holes by design. It might look like they’re plugged, but they’re meant to function this way, allowing any moisture to escape effectively. So, you don’t need to do anything special to keep them clear. Just ensure that the installation is done correctly, following local building codes, and the weep screed is at the right height above the foundation. If you have further concerns or unique site conditions, it might be helpful to have a professional take a look. Glad you found the article helpful!

    Reply
Add Your Reply